The red label is placed in front of
the Innovate system luminometer to
remind you to remove the transport
safety screw (a). Remove the white
cap and unscrew the instrument
cover with the supplied screwdriver
(b); unlock the lid by loosening the
screw. Open the lid.
d
c
b
a
The Innovate System Hardware User Guide
www.hygiena.com
4
IMPORTANT: Plate preparation files, report templates, pre-defined queries, and
database export drivers must be configured identically on all networked systems.
Innovate System Installation
This section will lead you step-by-step through the Innovate system
luminometer installation process. The Innovate system should be set up
in a dry, dust-free room and protected from direct sunlight and significant
temperature fluctuations. It should not be set up next to heating or air
conditioning units. The Innovate system luminometer should be operated in
an environment where the temperature does not exceed 30 °C and humidity
levels are below 85%.
3.1
SPACE REQUIREMENTS
The luminometer has the following dimensions:
• W x D x H: 33 x 43 x 27 cm
• The Innovate system luminometer should be set up so the rear panel
connection ports are easily accessible and not subjected to physical
stress. Allow for sufficient space on the side of the instrument for the
reagent tray and the PC used for Innovate.im.
The original packaging is reusable and should be retained for any future
transport of the instrument. When unpacking the instrument, make sure
the shipment is complete and shows no sign of transport damage. The
packaging is designed to eliminate transport damage. Should the
instrument or instrument parts appear damaged, please notify your local
Hygiena representative immediately.
Please verify that all components were shipped and received in good
condition by referencing the packing list provided with the instrument.
If items are missing or damaged, please contact Hygiena immediately.
3.2 CONNECTING
3.2.1 Remove the transport safety screw
Remove all of the foam pieces
inside the instrument (c, d).