About The System
Manual Regeneration (Step / Cycle Valve)
If screen is locked, press and hold SETTINGS for 3 seconds to unlock. To initiate an imme-
diate regeneration, press and hold the MANUAL REGEN key for 5 seconds. The valve will
immediately start into manual regeneration.
To initiate a delayed regeneration, press the MANUAL REGEN key once to turn on and a re-
generation will be queued at the next pre-set regeneration time (i.e. 2:00 a.m.).. To cancel,
press the MANUAL REGEN key again.
Operation During A Power Failure
In the event of a power failure, the valve will keep track of the time and day for 48 hours.
The programmed settings are stored in a non-volatile memory and will not be lost during a
power failure. If power fails while the unit is in regeneration, the valve will finish regenera-
tion from the point it is at once power is restored. If the valve misses a scheduled regen-
eration due to a power failure, it will queue a regeneration at the next regeneration time
once power is restored.
12
Содержание 565BM-100
Страница 9: ...Filter Installation 9...
Страница 17: ...17...
Страница 19: ...Control Valve Exploded View Control Valve Exploded View 19...
Страница 21: ...Power Head Exploded View 21...