Operator’s duty of care
The system is constructed and manufactured with respect to and in consideration of all current
standards as well as further technical specifications, and corresponds to the latest state-of-the-art
technology, allowing for maximum safety under all operating conditions.
System safety in operation can only be assured if all necessary measures are taken beforehand. It is
part of the operator’s diligence to plan and monitor such measures and implement them with due
care.
The operator must ensure that
-
the system is used in accordance with the specified purpose.
-
the system is maintained in a serviceable condition, with the safety facilities being monitored
for correct function in regular intervals.
-
the operation and maintenance manual is always in a legible condition and available next to
the unit.
-
the operation, maintenance and repair work is carried out by qualified and authorised
personnel only.
-
all safety and warning information attached to the system must not be removed and must be
kept in a legible condition.
-
the supplied log book must be kept up to date.
2.3. Appropriate use
The system is manufactured to the latest German technical safety standards employing the latest
state-of-the-art technology.
If incorrectly treated, not maintained properly at regular intervals or not used for the correct purpose
according to the specifications, the unit may incur risks and/or damage.
Operation of system shall only be within the technical parameters and limit values stated in chapter II.
The HYDROWELL unit is to be operated and maintained in good working order and according to the
specification it was designed for only.
Important!
Any other use of the system, other than described, is deemed to be not in
accordance with the specification.
The manufacturer / supplier do not accept any liability resulting from the
improper use of the system. Such risks are borne by the operator alone.
All regulations and instructions in the operating and maintenance manual and
such regulations as are applicable locally must be strictly adhered to.
Any malfunctions must be corrected immediately.
Содержание HYDROWELL Compact 10E
Страница 16: ...P a g e 16 38 Reactor Dimensional drawing with parameters from technical data sheet...
Страница 18: ...P a g e 18 38 Control Box Power switch ON OFF UV monitor Cable fittings...
Страница 30: ...P a g e 30 38 Appendices 1 Installation Schematic UV Disinfection System...
Страница 31: ...P a g e 31 38 Appendices 2 Wiring diagram HydroWELL 2 E 5 E and 10 E with sensor...