Please complete & Sign this form and fax to HYDROTEC to arrange commissioning of your Hydro
WELL
®
Water
Disinfection Unit on FAX: 01494 796 049 or Email: [email protected]
Name
Site Contact
Company
Company
Address
Site Address
Full Postcode
Full Postcode
Tel
Site Tel
Fax
Installation Area
Tick to confirm:
❑
The Hydro
WELL
has been installed as per our Installation Instructions.
❑
All parts are on site as per packing checklist.
❑
The control box has been secured to the wall.
❑
Electrical supply (fused spur outlet 240V AC 50Hz 5AMP) within 1.5 metres of control box has been
provided and connected.
(DO NOT TURN THE POWER ON).
❑
Isolation valves have been installed either side of the UV vessel.
❑
Compact
models only: The UV vessel has been installed in horizontal pipework with the reactor vessel
vertically (drain cock down).
❑
Standard
models only: The UV vessel has been installed in vertical pipework with the reactor vessel
horizontally (drain cock down).
❑
Select
models only: The UV vessel has been installed in horizontal pipework with the reactor vessel
horizontally (drain cock down).
❑
There is a minimum of 500mm free servicing clearance measured from the end of the lamp head(s).
❑
The UV vessel is plumbed in and water to inlet valve is provided.
❑
The building has been cleaned / sterilised to BS8558 standard.
❑
On-site parking will be available.
By signing this form we agree to the following: Should any of the above not have been carried out at the
time of the agreed visit; a further inspection will be required prior to a Commissioning Certificate being
issued. This will be carried out upon the issue of a Purchase Order for £500.00. Less than 48 hours
cancellation notice will also incur a £350.00 charge.
Please do not hesitate to call us should you be having difficulties with the completion of this form.
Required commissioning date ___ / ___ / ____. Commissioning is normally carried out within
15 working days.
Signed……………………......... Print Name……..……………………………………..Date…………………......
For Office Use Only:
Job No:
Model:
Serial No:
No of
Units:
Ship Date:
Remarks:
Hydrotec Engineers
Comments:
Содержание HYDROWELL Compact 10E
Страница 16: ...P a g e 16 38 Reactor Dimensional drawing with parameters from technical data sheet...
Страница 18: ...P a g e 18 38 Control Box Power switch ON OFF UV monitor Cable fittings...
Страница 30: ...P a g e 30 38 Appendices 1 Installation Schematic UV Disinfection System...
Страница 31: ...P a g e 31 38 Appendices 2 Wiring diagram HydroWELL 2 E 5 E and 10 E with sensor...