Appendices 3:
Start-up and Instruction Record
HydroWELL
®
System size / Serial number:
_________________________________________________
Customer:
_________________________________________________
◼
Correct installation:
yes
no
◼
Isolation valves provided on both sides: (for Service)
yes
no
◼
Are the connections water tight?
yes
no
◼
Electrical installation correct:
yes
no
◼
Mains voltage is applied:
yes
no
◼
Normal function of system:
yes
no
◼
Display functions working:
yes
no
◼
Test fault report working:
yes
no
◼
Transmission:
____________________
%
◼
Flow rate:
____________________
m³/h
◼
Calibration of system done:
yes
no
◼
Notes:
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
The operator was instructed in the machine operation. The required operation and maintenance manual was handed over. It
was stated that despite a careful design and installation mains water of drinking water quality will only be available at all
times when regular water use and unit maintenance are provided in all areas of installation and at all times.
Site/Date:
____________________________________________________________________
Customer:
__________________________
Supplier:
___________________________
Содержание HYDROWELL Compact 10E
Страница 16: ...P a g e 16 38 Reactor Dimensional drawing with parameters from technical data sheet...
Страница 18: ...P a g e 18 38 Control Box Power switch ON OFF UV monitor Cable fittings...
Страница 30: ...P a g e 30 38 Appendices 1 Installation Schematic UV Disinfection System...
Страница 31: ...P a g e 31 38 Appendices 2 Wiring diagram HydroWELL 2 E 5 E and 10 E with sensor...