P a g e
26 | 38
Chapter
V
Inspection & Maintenance
1. Inspection by the operator
For the safe operation of your UV disinfection system a regular inspection for possible damages,
leakages and other anomalies is to be performed for all parts of the system.
We recommend to check the following operating parameters at least within the predefined intervals
and to keep them on the record in an operating logbook (see Appendices 6).
Attention:
A carefully kept operating logbook maintains your warranty claims.
Inspection
Daily
Weekly
Operating display
X
UV intensity
X
Operating hours absolute
X
Operating hours relative
X
Water counter
X
Содержание HYDROWELL Compact 10E
Страница 16: ...P a g e 16 38 Reactor Dimensional drawing with parameters from technical data sheet...
Страница 18: ...P a g e 18 38 Control Box Power switch ON OFF UV monitor Cable fittings...
Страница 30: ...P a g e 30 38 Appendices 1 Installation Schematic UV Disinfection System...
Страница 31: ...P a g e 31 38 Appendices 2 Wiring diagram HydroWELL 2 E 5 E and 10 E with sensor...