Discharge-Outlet Piping:

The  discharge  piping  for  short
runs  can  be  of  the  same  size  as
the  discharge  of  the  pump.  It  is
recommended that longer runs be
1  to  2  sizes  larger  depending  on
the  length.  Any  elevated  points
will  retain  air  pockets,  and  it  is
recommended  that  air  vents  or
bleed  lines  be  installed  at  these
points  to  evacuate  entrapped  air.
Installation  of  a  valve  near  the
discharge  of  the  pump  is
recommended to isolate the pump
during 

maintenance 

and

shutdown.

It is recommended that a pressure
gauge  be  installed  near  the
discharge  of  the  pump  to
assist in troubleshooting potential
performance problems.

NEMA 4 Junction Box
(Optional):

A  NEMA  4  junction  box  should
be  used  to  make  power  and
control  connections  if  electrical
control  panel  is  to  be  set  remote
from  the  pump  station.  The
Hydromatic  NEMA  4  junction
box is provided with compression

connections for sealing all wires.
No  sealing  compound  is  needed
to make connections waterproof.
Wiring  diagrams  are  provided
with  the  panel  for  making
connections.  An  extra  set  of
diagrams  is  included  so  that  one
set  can  be  used  in  the  station
when  making  connections.  The
size  wire  to  use  from  panel  to
station depends on motor size and
distance in feet.
The wire size table on Page 4 can
be  used  as  a  guideline  for  wire
size. Be sure each wire is checked

Содержание DRY PIT

Страница 1: ...NOTE To the installer Please make sure you provide this manual to the owner of the equipment or to the responsible party who maintains the system Installation and Service Manual Wastewater Lift Statio...

Страница 2: ...rature The sensors are connected in series with the motor starter coil so that the starter is tripped if heat sensor opens The motor starter is equipped with overload heaters so all normal overloads a...

Страница 3: ...ng Pump Stand The pump will ship from the factory on a dry pit pump stand The suction and discharge of the pump will be oriented at the factory per the prescribed customer order The dry pit pump must...

Страница 4: ...p to assist in troubleshooting potential performance problems NEMA 4 Junction Box Optional A NEMA 4 junction box should be used to make power and control connections if electrical control panel is to...

Страница 5: ...ace Control level can be changed at any time by loosening the snubber and readjusting cord length In either a simplex or duplex system the lower or turn off control is set just above the drywell inlet...

Страница 6: ...the override control level 7 Turn both switches to Auto position and both pumps should start and operate together until level drops to turn off point 8 Repeat this operation cycle several times befor...

Страница 7: ...lted in clamp ring 7 After ring is removed turn housing upright and bump on hardwood blocks This should jar the stator loose and allow it to drop out 8 Thoroughly clean housing before replacing new st...

Страница 8: ...n inner face of the bearing when replacing Pressing on the outer face can damage the bearing Bearings are standard size that can be obtained from any bearing supply house or can be obtained from the f...

Страница 9: ...mp is operating 5 If pump has been in service for some time and capacity falls off remove pump and inspect impeller for wear Motor stops and then restarts after short period but overload heaters in st...

Страница 10: ...dance with the printed instructions provided b to failures resulting from abuse accident or negligence c to normal maintenance services and parts used in connection with such service d to units which...

Страница 11: ......

Страница 12: ...Line Voltage _________________________________Actual ___________________________________ Voltage to Pumps _____________________________________Actual ___________________________________ Type of Junct...

Отзывы: