Hydromatic DRY PIT Скачать руководство пользователя страница 12

START-UP REPORT

cut along dotted line

Distributor:__________________________________________________ Order No.: _________________________
Installing Contractor: _________________________________________ Phone: ____________________________
Sales Contact: ______________________________________________ Phone: ____________________________
Customer: ______________________________________________________________________________________
Location: _______________________________________________________________________________________

1. SYSTEM INFORMATION
Size of Wet Well:_______________________________________Manufacturer: _____________________________
Discharge from Bottom of Basin: ________________________Discharge Location:________________________
Inlet from Bottom of Basin: _____________________________Inlet Location: _____________________________
Type of Check Valves: __________________________________Type of Piping: ____________________________
Does System Have Suction Gauges?   

 Yes   

 No        

Suction Pressure Reading: __________________

Does System Have Discharge Gauges?   

 Yes   

 No    

Discharge Pressure Reading:________________

Liquid Being Pumped:_______________________Temperature (F°): __________ Pct. of Solid (%):___________
Is a Sketch or Photograph of System Available?   

 Yes   

 No    If So, Please Attach.

Any Additional Comments on System:______________________________________________________________

_______________________________________________________________________________________________

2. ELECTRICAL INFORMATION
Control Panel Part Number: _____________________________Panel Rated Amps: ________________________
Manufacturer: _________________________________________Voltage: _______________ Phase: ____________
Heater Size:___________________________________________Location of Panel to Wet Well: _______________
Incoming Line Voltage: _________________________________Actual? ___________________________________
Voltage to Pumps: _____________________________________Actual? ___________________________________
Type of Junction Box: __________________________________Manufacturer of Junction Box: ______________
Are Floats Installed in Wet Well?   

 Yes   

 No       Are Floats Set to Engineer’s Specs?   

 Yes   

 No   

Are Floats Wired for Proper Sequencing?   

 Yes   

 No       Are Heat Sensors Hooked Up?   

 Yes   

 No   

Is the Seal Leak Detection Hooked Up?   

 Yes   

 No   

Any Additional Comments on Electrical: ____________________________________________________________

_______________________________________________________________________________________________

3. PUMP INFORMATION
Type of Pump:_________________________________________Serial Number of Pump: ____________________
Voltage of Pump: ________________ Phase: _______________RPM: _________________ Amps: ____________
Impeller Size:____________________ C.O.S. TDH: __________GPM: _________________
Voltage Supplied from Panel:____________________________Actual?___________________________________
Actual Amperage (All Phases):  Phase 1 Amps: ________ Phase 2 Amps: ________ Phase 3 Amps: ________
Define the Rotation of the Pump:   

 Clockwise   

 Counterclockwise

Method Used to Check Rotation:   

 Viewed from the Top   

 Viewed from the Bottom

Any Additional Comments on Pumps: ______________________________________________________________

_______________________________________________________________________________________________

4. ACKNOWLEDGE
Acknowledge that all information is accurate and proper procedures have been followed.
Customer: ___________________________________________________________________ Date: _____________
Start-up Technician:___________________________________________________________ Date: _____________

Send to Warranty Manager, 1101 Myers Parkway, Ashland, OH 44805

 

or Fax to 419-207-3344

 

or email to [email protected] 

 

or submit online at http://forms.pentairliterature.com/startupform/startupform.asp?type=h

Содержание DRY PIT

Страница 1: ...NOTE To the installer Please make sure you provide this manual to the owner of the equipment or to the responsible party who maintains the system Installation and Service Manual Wastewater Lift Statio...

Страница 2: ...rature The sensors are connected in series with the motor starter coil so that the starter is tripped if heat sensor opens The motor starter is equipped with overload heaters so all normal overloads a...

Страница 3: ...ng Pump Stand The pump will ship from the factory on a dry pit pump stand The suction and discharge of the pump will be oriented at the factory per the prescribed customer order The dry pit pump must...

Страница 4: ...p to assist in troubleshooting potential performance problems NEMA 4 Junction Box Optional A NEMA 4 junction box should be used to make power and control connections if electrical control panel is to...

Страница 5: ...ace Control level can be changed at any time by loosening the snubber and readjusting cord length In either a simplex or duplex system the lower or turn off control is set just above the drywell inlet...

Страница 6: ...the override control level 7 Turn both switches to Auto position and both pumps should start and operate together until level drops to turn off point 8 Repeat this operation cycle several times befor...

Страница 7: ...lted in clamp ring 7 After ring is removed turn housing upright and bump on hardwood blocks This should jar the stator loose and allow it to drop out 8 Thoroughly clean housing before replacing new st...

Страница 8: ...n inner face of the bearing when replacing Pressing on the outer face can damage the bearing Bearings are standard size that can be obtained from any bearing supply house or can be obtained from the f...

Страница 9: ...mp is operating 5 If pump has been in service for some time and capacity falls off remove pump and inspect impeller for wear Motor stops and then restarts after short period but overload heaters in st...

Страница 10: ...dance with the printed instructions provided b to failures resulting from abuse accident or negligence c to normal maintenance services and parts used in connection with such service d to units which...

Страница 11: ......

Страница 12: ...Line Voltage _________________________________Actual ___________________________________ Voltage to Pumps _____________________________________Actual ___________________________________ Type of Junct...

Отзывы: