Compressor Conversion Instructions
Linear to Rotary & Rotary to Linear Conversion
Removal of Compressor
Removal of Compressor
1. Cut Power to system from home breaker.
2. Remove OPS cover, open control panel, and shut-off breakers.
3. Remove air pressure switch by cutting the airline.
4. Disconnect the electrical cord from the pump to control panel.
5. Remove Compressor from base by unscrewing mounts.
Installation of Compressor
6. Mount new compressor by banding it to the base with self-tapping screws.
7. Connect electrical cord into control panel.
8. Glue conversion pressure switch onto airline.
9. Connect airline to compressor.
10. Turn breakers on, close control panel, and install OPS cover.
11. Turn power on and test compressor/system for proper function.
Linear Compressor
Rotary Vane Compressor
Cord Grips
Cord Grips
Pressure Switch
Pressure Switch
Control Panel
Control Panel
Содержание AP Series
Страница 1: ......
Страница 15: ...Appendix 3 Technical Manual for Timers Grasslin 24 Hr Timer Omeron Micro Dose Timer ...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ...Appendix 5 Drawings AP 500 ATU LPA 500 ATU AP 600 ATU AP 750 ATU AP 1000 ATU AP 1500 ATU ...