![Hydro Action AP Series Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/hydro-action/ap-series/ap-series_operation-and-maintenance-manual_2191817054.webp)
AK/HA Manufacturing, LLC
Installation Checklist
Hydro-action Industries' aerobic treatment systems should be serviced at least every six months per
NSF requirements. Please consult the Installation Manual while performing this checklist.
Chose site and soil condition, excavate
notes:
Install gradable material and level system
notes:
Fill tanks with water and leak check while burying
notes:
Connect inlet and discharge piping
notes:
Install OPS as per instructions and run power conduit
notes:
Install diffuser assembly’s
notes:
Install OPS and Tank Covers w/ supplied security screws
notes:
Follow start-up procedure and educate homeowner on their system
notes:
Perform system check to insure proper operation
notes:
Fill out installation / warranty sheet
notes:
Give copy of homeowner’s manual to homeowner
notes:
Give homeowner copy of service contract and warranty sheet
notes:
Send in installation warranty sheet to Manufacturer
notes:
Содержание AP Series
Страница 1: ......
Страница 15: ...Appendix 3 Technical Manual for Timers Grasslin 24 Hr Timer Omeron Micro Dose Timer ...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ...Appendix 5 Drawings AP 500 ATU LPA 500 ATU AP 600 ATU AP 750 ATU AP 1000 ATU AP 1500 ATU ...