5 | Setting up/assembling/commissioning
HYDAC FILTER SYSTEMS GMBH
52 / 124
BeWa CTU1x3x-CTU1x4x 4093420f en-us web
5.6 Commissioning
ü
All the previously described work is required for commission-
ing. The subsequent steps for commissioning given below.
1. Install the protective gloves from the scope of delivery, for
details see
Installing / Removing the protective gloves
.
If the protective gloves are already installed, check them to
ensure that they fit correctly.
2. Take the sticker
Clean end cap using only a moist cloth!
of
the appropriate language included in the scope of delivery
and affix it to the lower right part of the border film of the
door.
3. Take the supporting sieve supplied and put it in the filter
membrane holder.
4. Fill the test liquid in the extraction unit, for details, see
the test liquid / Filling the extraction unit [
5. Clean the analysis chamber thoroughly using the Flushing of
inner chamber program and the spray gun until a negative
control value is achieved, for details, see
negative control value - Settings/parameters [
ence shows that at least 12 flushing cycles of ≈ 15 liters are
required.
O
The installation check is complete.