Performing maintenance
8. (1) Before screwing the union nut back
on, apply a lubricant.
We recommend using white Vaseline
as a lubricant
HYDAC part no. 632391
Screw the filter bowl (2) over the
coupling nut (1) onto the filter head in a
counterclockwise direction.
Tighten the union nut by hand.
9. Unscrew the return hose "R" from the
CTM-E module.
Put the open end of the return hose into
the container with the previously
drained test liquid.
R
10. Select the "Fill" menu item from the
user interface.
Note that the software constantly
monitors the level and will stop the
filling process once the maximum level
has been reached.
11. To begin the filling process, press the
"Start" button.
12. The test liquid is pumped into the tank
using the membrane pump.
13. Once the container is empty, stop the
filling process or put the filler hose into
another container of test liquid, to
completely fill the system.
14. After completing the fill process, screw
the open end onto the CTM-E module.
R
15. Check the filters for possible leaks.
16. The CTM-SC is now ready for
operation.
CTM-SC 3xxx series
en(us)
Page 37 / 56
BeWa CTM-SC 4165698b en-us 2017-05-10.docx
2017-05-10
Содержание CTM-SC 3 Series
Страница 55: ......