11 SERVICE WORK ON THE CHASSIS
36
11.12
Installing the lower triple clamp
x
0
0
1
1
0
0
2
2
0
0
3
3
800221-10
Main work
–
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount the upper steering head
bearing.
–
Check whether the upper steering head seal
1
is correctly positioned.
–
Slide on protective ring
2
and O-ring
3
.
B01867-10
–
Position the upper triple clamp with the handlebar.
–
Mount screw
4
but do not tighten yet.
B01868-10
–
Position the fork legs.
Bleeder screws
5
face forward.
Info
Grooves are milled into the side of the upper end of the fork legs. The sec-
ond milled groove (from the top) must be flush with the top edge of the upper
triple clamp.
B01869-10
–
Fully tighten screws
6
.
Guideline
Screw, bottom triple clamp
M8
12 Nm (8.9 lbf ft)
B01870-10
–
Tighten screw
4
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
Содержание 2014 FC 450 EU
Страница 1: ...OWNER S MANUAL 2014 FC 450 EU Art no 3402004en ...
Страница 2: ......
Страница 92: ...22 TECHNICAL DATA 90 Screw front wheel spindle M24x1 5 45 Nm 33 2 lbf ft ...