![Humboldt HM-2750 Series Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/humboldt/hm-2750-series/hm-2750-series_product-manual_2183673008.webp)
Installation and Set-up
Unpacking
Initial inspection should include checking for physical damage during
shipping and obvious external damage to the product.
Package contents are defined by your packing list. Make certain that
the contents of your shipment match the documentation provided by
your packing list.
Setup
1. Unclamp the counterbalance lever-loading arm by undoing the
beam jack.
2. Screw in the consolidation dial gauge arm and associated
pillar to the machine.
3. Place ball races on track.
4. Place carriage assembly on ball races, placing slotted end over
the geared jack.
5. Locate proving ring between bracket and carriage body (the
reaction bracket has a ball socket for clamping) by screwing to
the proving ring threaded blocks, utilizing the adapters provided.
The dial gauge should be compressed to its midway position
(approximately 5mm) by the adjusting screws in the proving ring.
Electrical Connections
Humboldt HM-2750 Series controllers are equipped with an internal,
digital, switching power supply, which allows them to be used with most
power configurations throughout the world. The units are supplied with
an IEC electrical cord with a standard 110V USA plug.
HM-2750 Series Controllers arrive ready for operation. Attach the
controller to top of motor housing with supplied velcro fasteners.
Attach the supplied IEC electrical cord to the machine and plug into a
standard wall receptacle for use in the United States.
For locations other than the U.S., replace the supplied electrical cord
with an IEC cord with the correct plug for your application. The supplied
cord can also be used by cutting the standard plug from the cord and
attaching the correct plug.
7