INSTALLATION MANUAL
Optibox 16
Page 5 of 10
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
Step 6
Cable entry and fixing
V.1 Incoming cables kann be fixed with
cable ties at point A and B. The strenght
member can be fixed with the strain re-
lieve element.
V.2 Depending on the diameter of the
cable or the gasblocker, the inner part of
the cable fixing section can be cut out to
have more space for big diameters.
The following cable length according to the
reference should be used during Installa-
tion:
A: fixing strength member
= 45mm
B: incoming loose tube
=150mm
C: complete length for Fibers into the cas-
settes = 2000mm