background image

INSTALLATION MANUAL 

Optibox 16 

Page 2 of 10 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 
accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the 
general handling of these products please contact HUBER+SUHNER. 

 

Installation 

red: 3x Cable entry  
yellow: 6x Cable Exit  
green: Area for cableguiding and slots for  
fixing the cassettes  
purple: Area for cableguiding, patching 
and overlength storage 
  
 

 

Step 1 

Preparing cable entries  

(U-Shape grommets and cable glands) 
At the bottom side of the box you can 
open 8 holes for cable entries or exit with 
U-Shape grommets or cable glands. If you 
are using cable glands you have to drill the 
correct hole. You can use M16 and M25 
cable glands. If you are using M25 glands 
please take care that the outer dimension 
is max. 33.5mm.  
  
If you are using U-Shapes, you have to 
make a cut according to the red line on the 
picture. After that you can break out easily.  
  
 

 

 

Содержание Optibox 16

Страница 1: ...ty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products For advice concerning the general handling of these products please contact...

Страница 2: ...please contact HUBER SUHNER Installation red 3x Cable entry yellow 6x Cable Exit green Area for cableguiding and slots for fixing the cassettes purple Area for cableguiding patching and overlength sto...

Страница 3: ...allation of these products For advice concerning the general handling of these products please contact HUBER SUHNER Step 2 Wall mounting For wall mounting put the Box on the wall adapt the three fixin...

Страница 4: ...these products please contact HUBER SUHNER Step 4 Overlength frame optional Positions for screwing the overlength frame to the wall Positions for screwing Screws are includ ed the OTB16 to the overle...

Страница 5: ...se products For advice concerning the general handling of these products please contact HUBER SUHNER Step 6 Cable entry and fixing V 1 Incoming cables kann be fixed with cable ties at point A and B Th...

Страница 6: ...NER Step 7 Mounting of patchfield and cable fixing latch If you are using the patchfield you have to snap it into the inlay Put the snappers into the cutout of the inlay and push it to the left accord...

Страница 7: ...se contact HUBER SUHNER Step 8 Cassette versions The OTB16 can be populated with differ ent cassettes You can use SCM A MCM B and SPC C Splitter Cassettes De pends of the way the OTB16 should be popul...

Страница 8: ...ontact HUBER SUHNER Step 10 Fibermanagement ACS MCM 1 Splicing area 2 Overlength area and chaos field The ACS System can cover the following quantities 48 pieces 250 m 24 pieces 600 m 12 pieces 900 m...

Страница 9: ...products please contact HUBER SUHNER Step 12 Detail Fiber Guiding Tool The fiber guiding tool can be used to place single fibers in the OTB16 It can be bro ken away from its Position The broken out A...

Страница 10: ...ools and accessories other than the ones recommended herein Any installation performed by unqualified personnel voids the product warranty provided by HUBER SUHNER All due care and attention must be e...

Отзывы: