background image

INSTALLATION MANUAL 

Optibox 16 

Page 3 of 10 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 
accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the 
general handling of these products please contact HUBER+SUHNER. 

Step 2 

Wall mounting  

For wall mounting, put the Box on the wall, 
adapt the three fixing hole point to the 
wall. After that you can drill the holes and 
fix the box on the wall.  
  
 

 

Step 3 

If you are using the connection grommet, 
you can mount two boxes side by side.  
 

 

Function of downholder: 

The mounted round downholder can be 
used to park dustcaps. The downholder 
can also be broken away and screwed into 
the the right hand side of the box. This is 
recommended if you are using a side by 
side configuration.  
  
 

 
 
 
 

Содержание Optibox 16

Страница 1: ...ty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products For advice concerning the general handling of these products please contact...

Страница 2: ...please contact HUBER SUHNER Installation red 3x Cable entry yellow 6x Cable Exit green Area for cableguiding and slots for fixing the cassettes purple Area for cableguiding patching and overlength sto...

Страница 3: ...allation of these products For advice concerning the general handling of these products please contact HUBER SUHNER Step 2 Wall mounting For wall mounting put the Box on the wall adapt the three fixin...

Страница 4: ...these products please contact HUBER SUHNER Step 4 Overlength frame optional Positions for screwing the overlength frame to the wall Positions for screwing Screws are includ ed the OTB16 to the overle...

Страница 5: ...se products For advice concerning the general handling of these products please contact HUBER SUHNER Step 6 Cable entry and fixing V 1 Incoming cables kann be fixed with cable ties at point A and B Th...

Страница 6: ...NER Step 7 Mounting of patchfield and cable fixing latch If you are using the patchfield you have to snap it into the inlay Put the snappers into the cutout of the inlay and push it to the left accord...

Страница 7: ...se contact HUBER SUHNER Step 8 Cassette versions The OTB16 can be populated with differ ent cassettes You can use SCM A MCM B and SPC C Splitter Cassettes De pends of the way the OTB16 should be popul...

Страница 8: ...ontact HUBER SUHNER Step 10 Fibermanagement ACS MCM 1 Splicing area 2 Overlength area and chaos field The ACS System can cover the following quantities 48 pieces 250 m 24 pieces 600 m 12 pieces 900 m...

Страница 9: ...products please contact HUBER SUHNER Step 12 Detail Fiber Guiding Tool The fiber guiding tool can be used to place single fibers in the OTB16 It can be bro ken away from its Position The broken out A...

Страница 10: ...ools and accessories other than the ones recommended herein Any installation performed by unqualified personnel voids the product warranty provided by HUBER SUHNER All due care and attention must be e...

Отзывы: