INSTALLATION MANUAL
Optibox 16
Page 4 of 10
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
Step 4
Overlength frame (optional):
Positions for screwing the overlength
frame to the wall.
Positions for screwing (Screws are includ-
ed) the OTB16 to the overlength frame.
Knock out hole for incoming and outgoing
cables.
Fixing position for incoming or outgoing
cables (can be used with 2 cable ties).
The loose tube overlength can be stored in
the overlength frame as shown in the pic-
ture according to direction of the arrows.
One or more tubes can be guided to the
OTB16 by using the ramp. Other tubes
can be guided out of the frame as shown.
Step 5
Incoming loose tubes in the OTB16 Inlay.
Remove the knock out hole of the base to
use it as shown.