SmartACU2000D Smart Array Controller
User Manual (with No PID Module)
5 Electrical Connections
Issue 01 (2020-02-14)
Copyright © Huawei Technologies Co., Ltd.
56
Figure 5-9
Removing a fastener
Step 3
Connect one end of the optical jumper to the fiber adapter.
Step 4
Route the other end of the optical jumper through the cable hole on the side of the ATB, and
connect the cable to the ATB.
Step 5
Connect the peripheral optical cable to the ATB, splice the optical cable and the optical
jumper, and wind the spliced cable around the fiber spool on the ATB.
Only professionals are allowed to splice fibers.
Figure 5-10
Connecting optical cables
Step 6
Check that the cables are connected correctly and securely. Then reinstall the optical cable
fastener and external mechanical parts.