Figure 4-8 Wall-mounted installation
Step 3 Place the first battery expansion module on the wall-mounted support, install the
left and right connective pieces, and install the second battery expansion module,
third battery expansion module, and power control module from bottom to top.
WARNING
After installing a module, install and tighten the connecting pieces and screws on
the left and right sides of the module, and then install the next module.
Step 4 Secure the power control module to the wall.
LUNA2000-(5-30)-S0
User Manual
4 System Installation
Issue 07 (2022-01-10)
Copyright © Huawei Technologies Co., Ltd.
60