6
System Commissioning
6.1 Verification Before Power-On
Table 6-1 Check items and acceptance criteria
No.
Check Item
Acceptance Criteria
1
Battery installation
The installation is correct and reliable.
2
Cables routing
Cables are routed properly as required
by the customer.
3
Cable tie
Cable ties are evenly distributed and no
burr exists.
4
Grounding
The PE cable is connected correctly,
securely, and reliably.
5
Switch
The DC switch and all switches
connected to the battery are OFF.
6
Cable connection
The AC output power cable, DC input
power cable, battery cable, and signal
cable are connected correctly, securely,
and reliably.
7
Unused terminal and port
Unused terminals and ports are locked
by watertight caps.
8
Installation environment
The installation space is proper, and
the installation environment is clean
and tidy.
LUNA2000-(5-30)-S0
User Manual
6 System Commissioning
Issue 07 (2022-01-10)
Copyright © Huawei Technologies Co., Ltd.
81