FusionModule1000A20 CT Solution
Maintenance Guide
5 Parts Replacement
Issue 01 (2019-02-25)
Copyright © Huawei Technologies Co., Ltd.
63
Preparations
Tools: Phillips screwdriver, protective gloves
Material: spare PD510 electricity meter
Documents: documents delivered with the PD510 electricity meter, management system
initial configuration table
Skill requirement: power distribution system engineer
For the table, see the initial configuration parameter manual for the solution in use.
Procedure
Step 1
(Optional) Remove the screws on the left of the PD510 electricity meter panel by using a
Phillips screwdriver and open the panel.
Step 2
Switch off the upstream circuit breaker of the electricity meter.
Step 3
Remove the terminal block from the PD510 electricity meter, and gently press the latch
outwards to remove the terminal block.
Step 4
Remove the faulty PD510 electricity meter, and install a new PD510 electricity meter, and
insert the latch.
Step 5
Install the removed terminal block, and ensure that the terminal block is connected properly.
Step 6
(Optional) Install the panel of the PD510 electricity meter.
Step 7
Configure the address and baud rate of the PD510 by referring to the management system
initial configuration table.
Step 8
Configure the PD510 electricity meter by following instructions in documents delivered with
the PD510 electricity meter.
Step 9
Check that the new PD510 electricity meter is working properly.
After power-on, press buttons on the PD510 panel, and check whether the LCD of the electricity meter
displays information properly.
----End
Follow-up Procedure
Dispose of the removed PD510 electricity meter that is confirmed faulty.
5.1.2.4 Replacing an SPD
Prerequisites
Do not replace an SPD during a thunderstorm.