FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
9 Installing Cables Outside Pre-fab. Modules
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
78
Figure 9-3
Connecting the generator start/stop cables for the UPS
(1) XT2 terminal block
----End