FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
8 Installing Devices Inside Pre-fab. Modules
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
52
8.1.2 Installing Batteries
Prerequisites
The pre-fab. modules have been installed.
Precautions
To ensure personal safety, unpack, move, and install batteries by following the
instructions in the manuals delivered with the batteries.
Except for necessary functional parts, wrap the exposed metal parts of tools such as
screwdrivers and wrenches with at least two layers of insulation tape.
Wrap the OT terminal of a cable with insulation tape, and remove the tape when the
cable is placed in position and the terminal to be connected is confirmed.
Leave one break point disconnected when connecting batteries at each layer, and connect
the break point on each layer after other cables are connected.
Tighten screws to prevent sparks generated upon power-on.
Only qualified technicians can connect battery cables.
Ensure that all the safety measures have been taken before installation.
Ensure that the circuit breakers in the battery circuit breaker (BCB) box are OFF when
installing batteries.
Never short-circuit the two poles of a battery when handling or installing batteries.
Preparations
Tools: Phillips screwdriver, pallet truck, adjustable wrench, protective gloves
Materials: insulation tape, battery, copper bar or cable
Documents: battery wiring diagram, documents delivered with the batteries
Skill requirement: personnel qualified for installing batteries
For the diagram, see the quick installation guide for the solution in use.
Procedure
Step 1
Use a pallet truck to move batteries to a position near the pre-fab. module door closest to the
installation position.
Step 2
Unpack the batteries.
Step 3
Open the front door of the battery cabinet.
Due to space limitation, connect power cables after placing batteries on one layer.
Step 4
Place batteries in the battery cabinet from bottom to top and from left to right.