FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
8 Installing Devices Inside Pre-fab. Modules
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
61
Figure 8-13
Removing the sealing plate from the suspended ceiling
9.
Push the sealing plate up at the cabinet side to separate the sealing plate hook from the
sealing plate mounting bracket, and remove the sealing plate.
10.
Route the ECC800 4G antenna cable from the cable tray to the top of cabinet A1 along
the cable chain.
11.
Route the 4G antenna cable into cabinet A1 through the cable hole on the top, route the
cable out through the cable manager, and connect the cable to the 4G antenna port on the
ECC800.
12.
Connect the RF_Z antenna to the RF_Z antenna port on the ECC800.
Figure 8-14
Installing the antenna
----End