Procedure
Step 1 Move the fire cylinder using a pallet truck to a position near the container door
closest to the installation position.
NO TICE
Do not move the fire cylinder over a long distance by hands.
Step 2 Move the fire cylinder to the installation position and secure it using steel straps.
NO TICE
Keep the pressure gauge panel outwards so that people can view the reading,
which also facilitates later maintenance.
Step 3 Connect the fire cylinder to the fire extinguishing pipeline.
NO TICE
Wrap the threads with sealing tape to ensure air tightness.
1. Remove the protective cover at the threaded adapter position of the container
valve, and connect the threaded adapter to the fire cylinder, as shown by (1)
in the figure.
2. Connect the I-shaped connection pipe to the threaded adapter.
3. Connect one end of the high-pressure hose to the fire cylinder and the other
end to the fire extinguishing pipeline, as shown by (2) in the figure.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
8 Installing Devices Inside the Pre-fab. Module
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
82