NO TICE
There are two rows of screw holes on the top of the pre-fab. module door. The
screws on the awning mounting plate need to be installed in the three holes in
the lower row, as shown in the following figure.
Figure 5-3 Installing an awning mounting plate
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
5 Installing External Accessories for the Pre-fab.
Module
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
51