Figure 8-12 Removing the ECC800-Pro main control module
3. Install the microSD card and SIM card in the corresponding slots in the
ECC800-Pro main control module.
Figure 8-13 Installing the microSD card and SIM card
4. Reinstall the ECC800-Pro main control module in the ECC800-Pro subrack.
Step 2 Install an antenna.
1. Unpack the RF_Z antenna reserved on the top of cabinet A1 and attach it to
the top of the cabinet.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
8 Installing Devices Inside the Pre-fab. Module
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
77