Name
Model/Function
Quantity
Bolt for
securing the
ground
copper bar
M12x30 stainless steel bolt assembly
Configure 1
PCS for each
ground point.
Heat shrink
tubing
● Diameter: 50 mm; radial shrinkage: 50%;
operating temperature range: 55°C to 105°C
● Connects mains input power cables.
Colors subject
to local
regulations,
10 m long for
each
SIM card
The SIM card is installed in a card slot in the
ECC800-Pro main control module. The SIM card
must support GSM and WCDMA.
1 PCS
MicroSD
card
The microSD card is installed in a card slot in the
ECC800-Pro main control module. The capacity
ranges from 16 GB to 128 GB. The recommended
capacity is 32 GB.
1 PCS
NO TE
● This table may not list some tools required at specific sites. Onsite installation personnel
and technical support personnel should prepare tools based on site requirements.
● Some dedicated tools and installation materials provided with the equipment may not
be listed in this table.
● Preventive measures should be applied before installation to avoid water seepage into
pre-fab. modules and equipment in the case of a sudden change in the weather.
3.2 Installation Personnel Requirements
●
Installation personnel must be trained and qualified by Huawei to master
methods for system installation, and must obtain work permits before they
begin to install the equipment.
●
Technical personnel from the customer must be trained by Huawei and
master the installation method.
●
The number of construction personnel depends on the project progress and
installation environment.
●
Construction personnel have read through the safety precautions and related
product documents before they begin working.
NO TE
● Common technician: familiar with the equipment installation process.
● Skilled technician: familiar with the equipment installation process and having an electrician
certificate.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
3 Installation Preparations
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
28