eAN3810A
Deployment Guide
1 eAN3810A Deployment Guide
Issue 01 (2017-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
42
1.3 MML Site Deployment
1.3.1 MML Site Deployment Process
This section describes the eAN3810A site deployment process.
Site deployment requires cooperation of engineers at sites and the OMC, who must master the
deployment process shown in Figure 1 in advance of the deployment.
Figure 1-21
Site deployment process
1.3.2 Hardware Installation and Power-on Check
This section describes how to perform hardware installation and power-on checks at the site
after eAN3810A hardware is installed. If a MicroSD card is used for local deployment,
engineers at the site need to insert the MicroSD card to the eAN3810A to load software and
the configuration file.
Prerequisites
The SD card has been prepared.
The eAN3810A is working correctly.