6
C. CHECK INLET GAS PRESSURE ..................................................................................................................................... 52
D. BOILER GAS VALVE ........................................................................................................................................................ 54
PART 7
– FIELD WIRING ........................................................................................................................................ 55
A. INSTALLATION MUST COMPLY WITH: ........................................................................................................................... 55
B. FIELD WIRING TERMINATIONS ...................................................................................................................................... 55
C. FIELD WIRING .................................................................................................................................................................. 55
D. LINE VOLTAGE WIRING FOR STANDARD BOILER ....................................................................................................... 56
E. ALARM CONNECTIONS ................................................................................................................................................... 56
F. LOW VOLTAGE CONNECTIONS FOR STANDARD BOILER .......................................................................................... 56
G. THERMOSTAT ................................................................................................................................................................. 56
H. OUTDOOR SENSOR ........................................................................................................................................................ 57
I. INDIRECT SENSOR ........................................................................................................................................................... 57
J. OPTIONAL 0-10 VOLT BUILDING CONTROL SIGNAL .................................................................................................... 57
K. OPTIONAL UL353 LOW WATER CUT-OFF INTERFACE KIT ......................................................................................... 58
L. WIRING OF CASCADE SYSTEM COMMUNICATION BUS ............................................................................................. 58
M. CASCADE MASTER PUMP AND SENSOR WIRING ...................................................................................................... 59
N. CASCADE FOLLOWER PUMP AND SENSOR WIRING .................................................................................................. 59
PART 8
– START-UP PREPARATION ................................................................................................................... 63
A. CHECK / CONTROL WATER CHEMISTRY ..................................................................................................................... 63
B. CHECK FOR GAS LEAKS ................................................................................................................................................ 64
C. FREEZE PROTECTION (WHEN USED) .......................................................................................................................... 64
D. FILL AND TEST WATER SYSTEM ................................................................................................................................... 64
E. PURGE AIR FROM WATER SYSTEM .............................................................................................................................. 65
F. CHECK THERMOSTAT CIRCUIT(S) ................................................................................................................................ 66
G. CONDENSATE REMOVAL ............................................................................................................................................... 66
H. FINAL CHECKS BEFORE STARTING BOILER ............................................................................................................... 67
I. CASCADE SYSTEM ........................................................................................................................................................... 67
J. LOCKOUT CONDITION ..................................................................................................................................................... 68
PART 9
– START-UP PROCEDURE ....................................................................................................................... 68
A. CONTROL OVERVIEW ..................................................................................................................................................... 68
B. NAVIGATION OF THE DISPLAY ...................................................................................................................................... 69
C. OPERATING INSTRUCTIONS ......................................................................................................................................... 69
D. PROGRAMMING BOILER SETTINGS ............................................................................................................................. 70
E. PROGRAMMING THE SYSTEM SETTING ...................................................................................................................... 71
F. SYSTEM SETTING PROGRAM NAVIGATION ................................................................................................................. 71
G. RESETTING THE MAINTENANCE SCHEDULE .............................................................................................................. 73
PART 10
– START-UP PROCEDURES FOR THE INSTALLER ............................................................................ 74
A. BOILER CONTROL STATUS MENU ................................................................................................................................ 74
Содержание EL-110
Страница 15: ...15 Figure 3 ...
Страница 61: ...61 Figure 29 ...
Страница 62: ...62 Figure 30 ...
Страница 87: ...87 Figure 33 ...
Страница 88: ...88 Figure 34 ...
Страница 89: ...89 Figure 35 LP 293 A NOTE Parts listed on the following page ...
Страница 94: ...94 ...
Страница 95: ...95 ...
Страница 96: ...96 MAINTENANCE NOTES ...