25
Figure 8
– LP-293-O
NOTES:
1. This drawing is meant to show system piping concept only.
2. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
3. Piping shown is Primary/Secondary.
4. System flow (secondary loop) should be greater than the boiler primary loop flow. In all cases, the boiler primary loop flow rate must be
maintained above the minimum flow rates published on p. 28, this manual.
5. Installations must comply with all local codes.
Содержание EL-110
Страница 15: ...15 Figure 3 ...
Страница 61: ...61 Figure 29 ...
Страница 62: ...62 Figure 30 ...
Страница 87: ...87 Figure 33 ...
Страница 88: ...88 Figure 34 ...
Страница 89: ...89 Figure 35 LP 293 A NOTE Parts listed on the following page ...
Страница 94: ...94 ...
Страница 95: ...95 ...
Страница 96: ...96 MAINTENANCE NOTES ...