13. The display shows the first screen containing the values
of the electrical parameters on the DC side of the inverter.
15/05/10 15:34:26
P R p
- - -
I r r
- - -
W / m 2
P n o m 3 . 5 0 0
k W
T c 4 5
° C
T e 3 0
° C
P d c 3 . 1 2 5
k W
V d c 3 8 9
V
I d c 8 . 0 1
A
n d c
- - -
G O – s t a r t r e c .
Select
E F F
14. By means of arrow key
to access to the second screen
with the values of electrical parameters of the AC side of
inverter.
Before to start the recording:
Verify the symbol “
” blinking at display which
means the search by the meter of RF connection with
the remote unit SOLAR-02
Verify that the Pac active power should be a positive
value. In the opposite case open the AC clamp and
rotate of 180 degree on the phase conductor
Verify that the AC efficiency
ac = Pac / Pdc
should be
a consistent value (e.g.: a situation of
ac > 1
is not
physically possible)
15/05/10 15:34:26
P d c 3 . 1 2 5
k W
V d c 3 8 9
V
I d c 8 . 0 1
A
n d c
- - -
° C
P a c 3 . 0 1 2
k W
V a c 2 3 1
V
I a c 1 3 . 0 3
A
n a c 0 . 9 6
G O – s t a r t r e c
Select
E F F
15. With remote unit always close to the main unit press
GO/STOP
key to start the recording. The “
Rec. Start
waiting…
” message is shown at display of main unit and the
“
HOLD
” message is shown at display of SOLAR-02 more
than the indication of residual time for “00” instance
15/05/10 15:34:26
P d c 3 . 1 2 5
k W
V d c 3 8 9
V
I d c 8 . 0 1
A
n d c
- - -
° C
P a c 3 . 0 1 2
k W
V a c 2 3 1
V
I a c 1 3 . 0 3
A
n a c 0 . 9 6
R e c . S t a r t w a i t i n g …
Select
E F F
16. When the “00” instant after the press of
GO/STOP
key is
reached, the recording starts and the units are correctly
synchronized. In these conditions the message “
Rec
running…
” is displayed on the main unit and the
“
Recording…
” message is displayed on the SOLAR-02
15/05/10 15:35:00
P d c 3 . 1 2 5
k W
V d c 3 8 9
V
I d c 8 . 0 1
A
n d c
- - -
° C
P a c 3 . 0 1 2
k W
V a c 2 3 1
V
I a c 1 3 . 0 3
A
n a c 0 . 9 6
R e c . R u n n i n g …
Select
E F F