4
1.2 Included in the delivery of the TPK without burner
Pre-fitted boiler with casing
The boiler is configured for connecting a pellet burner on its left or right side, or if neither of these
positions can be used, it can be connected via the cleaning access door
The boiler is fitted as standard with a manually operated cleaning mechanism for the exchanger
Cleaning shovel/ash pan and steel brush
Содержание TPK
Страница 1: ...1 with or without Scandpell ...
Страница 38: ...38 8 EEC declaration of conformity ...
Страница 39: ...39 9 Test certificate ...
Страница 40: ...40 Rev 11 100913 ...