Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack.
4.
Remove the access panel.
5.
Remove the air baffle.
6.
Remove the fan cage.
7.
Install the energy pack option.
8.
Route and connect the cable.
CAUTION: Do not connect the energy pack while the server is operating. Verify that all power to the server has
been removed.
Hardware options installation
75
Содержание ProLiant DL380 Gen10
Страница 33: ...Component identification 33...
Страница 58: ...Operations 58...
Страница 116: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 116...
Страница 124: ...7 Install the rear blank from the option kit Hardware options installation 124...
Страница 163: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 163...
Страница 165: ...Box 1 Box 2 Cabling 165...
Страница 166: ...Box 3 Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for LFF Cabling 166...
Страница 167: ...Cable routing Midplane 4LFF drive option Cabling 167...
Страница 173: ...Cabling 173...