8.
Install drives or drive blanks.
9.
Connect the power and data cables.
11. Slide the server into the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
The installation is complete.
Riser and riser cage options
Installing primary and secondary risers
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1.
2.
Do one of the following:
• Disconnect each power cord from the power source.
• Disconnect each power cord from the server.
Hardware options installation
119
Содержание ProLiant DL380 Gen10
Страница 33: ...Component identification 33...
Страница 58: ...Operations 58...
Страница 116: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 116...
Страница 124: ...7 Install the rear blank from the option kit Hardware options installation 124...
Страница 163: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 163...
Страница 165: ...Box 1 Box 2 Cabling 165...
Страница 166: ...Box 3 Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for LFF Cabling 166...
Страница 167: ...Cable routing Midplane 4LFF drive option Cabling 167...
Страница 173: ...Cabling 173...