8.
Install the riser cage.
9.
10. Install the server into the rack.
11. Connect the LAN segment cables.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
The installation is complete.
Installing a 1U or high performance heatsink
This procedure shows a standard heatsink as an example. The installation process is the same for all heatsinks.
Hewlett Packard Enterprise recommends
identifying the processor, heatsink, and socket components before performing
this procedure.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• The components included with the hardware option kit
• T-30 Torx screwdriver
• Thermal grease
Hardware options installation
145
Содержание ProLiant DL380 Gen10
Страница 33: ...Component identification 33...
Страница 58: ...Operations 58...
Страница 116: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 116...
Страница 124: ...7 Install the rear blank from the option kit Hardware options installation 124...
Страница 163: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 163...
Страница 165: ...Box 1 Box 2 Cabling 165...
Страница 166: ...Box 3 Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for LFF Cabling 166...
Страница 167: ...Cable routing Midplane 4LFF drive option Cabling 167...
Страница 173: ...Cabling 173...