22.
Install all components removed from the failed system board.
23.
Connect all cables disconnected from the failed system board.
24.
Install the air baffle.
25.
Install the access panel.
26.
Do one of the following:
• Slide the server into the rack.
• Install the server into the rack.
27.
Connect each power cord to the server.
28.
Connect each power cord to the power source.
29.
Power up the server.
30.
If removed, install the security bezel.
After you replace the system board, you must re-enter the server serial number and product ID:
1.
During the server startup sequence, press the
F9
key to access UEFI System Utilities.
2.
Select
System Configuration > BIOS/Platform Configuration (RBSU) > Advanced Options >
Advanced System ROM Options > Serial Number
, then press the
Enter
key.
3.
Enter the serial number and press the
Enter
key. The following message appears:
The serial number should only be modified by qualified service personnel.
4.
To clear the warning, press the
Enter
key.
5.
Enter the serial number and press the
Enter
key.
6.
Select
Product ID
. The following warning appears:
Warning: The Product ID should ONLY be modified by qualified service personnel. This value should
always match the Product ID located on the chassis.
7.
Enter the product ID and press the
Enter
key.
8.
To confirm exiting System Utilities, press the
F10
key.
The server will automatically reboot.
68
Removal and replacement procedures
Содержание ProLiant DL20
Страница 12: ...12 Customer self repair...
Страница 13: ...Customer self repair 13...
Страница 14: ...14 Customer self repair...
Страница 43: ...b Remove the fan cage c Remove the fan module Fan 1 Removal and replacement procedures 43...
Страница 44: ...Fan 2 9 If replacing fan 3 do the following a Disconnect the fan cables 44 Removal and replacement procedures...
Страница 59: ...8 Remove the expansion board Slot 1 Slot 2 Removal and replacement procedures 59...
Страница 87: ...Four bay SFF hot plug drive model Hot plug drive LED definitions Hot plug drive LED definitions 87...
Страница 89: ...Fan locations Fan locations 89...
Страница 96: ...Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 96 Cabling...
Страница 98: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 98 Optical drive cabling...
Страница 109: ...VCA Version Control Agent VCRM Version Control Repository Manager Acronyms and abbreviations 109...