Procedure
1.
If installed,
.
.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Disconnect all cables from the GPU.
5.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
7.
Remove the GPU cage.
8.
Remove the GPU.
9.
Remove the GPU riser board.
Removal and replacement procedures
57
Содержание ProLiant DL20
Страница 12: ...12 Customer self repair...
Страница 13: ...Customer self repair 13...
Страница 14: ...14 Customer self repair...
Страница 43: ...b Remove the fan cage c Remove the fan module Fan 1 Removal and replacement procedures 43...
Страница 44: ...Fan 2 9 If replacing fan 3 do the following a Disconnect the fan cables 44 Removal and replacement procedures...
Страница 59: ...8 Remove the expansion board Slot 1 Slot 2 Removal and replacement procedures 59...
Страница 87: ...Four bay SFF hot plug drive model Hot plug drive LED definitions Hot plug drive LED definitions 87...
Страница 89: ...Fan locations Fan locations 89...
Страница 96: ...Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 96 Cabling...
Страница 98: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 98 Optical drive cabling...
Страница 109: ...VCA Version Control Agent VCRM Version Control Repository Manager Acronyms and abbreviations 109...