CAUTION:
Do not operate the server for long periods with the access open or removed. Operating the server in this
manner results in improper airflow and improper cooling that can lead to thermal damage.
Rack warnings
WARNING:
To reduce the risk of personal injury or damage to the equipment, be sure that:
• The leveling jacks are extended to the floor.
• The full weight of the rack rests on the leveling jacks.
• The stabilizing feet are attached to the rack if it is a single-rack installation.
• The racks are coupled together in multiple-rack installations.
• Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
WARNING:
To reduce the risk of personal injury or equipment damage when unloading a rack:
• At least two people are needed to safely unload the rack from the pallet. An empty 42U rack can
weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might become unstable
when being moved on its casters.
• Never stand in front of the rack when it is rolling down the ramp from the pallet. Always handle the
rack from both sides.
WARNING:
To reduce the risk of personal injury or damage to the equipment, adequately stabilize the rack before
extending a component outside the rack. Extend only one component at a time. A rack may become
unstable if more than one component is extended.
WARNING:
When installing a server in a telco rack, be sure that the rack frame is adequately secured at the top and
bottom to the building structure.
Preparation procedures
Prerequisites
To access some components and perform certain service procedures, you must perform one or more of the
following procedures:
•
Access the product front panel
.
•
.
If you must remove a server from a rack or a non-hot-plug component from a server, power down the
server.
•
Extend the server from the rack
.
If you are performing service procedures in an Hewlett Packard Enterprise, Compaq branded, Telco, or
third-party rack cabinet, you can use the locking feature of the rack rails to support the server and gain
access to internal components.
For more information about Telco rack solutions, see the
.
•
Remove the server from the rack
Rack warnings
25
Содержание ProLiant DL20
Страница 12: ...12 Customer self repair...
Страница 13: ...Customer self repair 13...
Страница 14: ...14 Customer self repair...
Страница 43: ...b Remove the fan cage c Remove the fan module Fan 1 Removal and replacement procedures 43...
Страница 44: ...Fan 2 9 If replacing fan 3 do the following a Disconnect the fan cables 44 Removal and replacement procedures...
Страница 59: ...8 Remove the expansion board Slot 1 Slot 2 Removal and replacement procedures 59...
Страница 87: ...Four bay SFF hot plug drive model Hot plug drive LED definitions Hot plug drive LED definitions 87...
Страница 89: ...Fan locations Fan locations 89...
Страница 96: ...Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 96 Cabling...
Страница 98: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 98 Optical drive cabling...
Страница 109: ...VCA Version Control Agent VCRM Version Control Repository Manager Acronyms and abbreviations 109...