To replace the component, reverse the removal procedure.
Replacing the system board
About this task
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION:
To prevent damage to electrical components, take the appropriate anti-static precautions before
beginning any installation, removal, or replacement procedure. Improper grounding can cause
electrostatic discharge.
CAUTION:
To avoid ESD damage, when removing electrostatic-sensitive components from the failed system board,
place the components on a static-dissipating work surface or inside separate antistatic bags.
Procedure
1.
2.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
5.
.
6.
7.
.
Replacing the system board
63
Содержание ProLiant DL20
Страница 12: ...12 Customer self repair...
Страница 13: ...Customer self repair 13...
Страница 14: ...14 Customer self repair...
Страница 43: ...b Remove the fan cage c Remove the fan module Fan 1 Removal and replacement procedures 43...
Страница 44: ...Fan 2 9 If replacing fan 3 do the following a Disconnect the fan cables 44 Removal and replacement procedures...
Страница 59: ...8 Remove the expansion board Slot 1 Slot 2 Removal and replacement procedures 59...
Страница 87: ...Four bay SFF hot plug drive model Hot plug drive LED definitions Hot plug drive LED definitions 87...
Страница 89: ...Fan locations Fan locations 89...
Страница 96: ...Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 96 Cabling...
Страница 98: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 98 Optical drive cabling...
Страница 109: ...VCA Version Control Agent VCRM Version Control Repository Manager Acronyms and abbreviations 109...