background image

HPE ProLiant DL180 Gen10 Server User
Guide

Part Number: 874513-003
Published: February 2019
Edition: 3

Abstract

This document is for the person who installs, administers, and troubleshoots servers and
storage systems. Hewlett Packard Enterprise assumes you are qualified in the servicing of
computer equipment and trained in recognizing hazards in products with hazardous energy
levels.

Содержание ProLiant DL180

Страница 1: ...Edition 3 Abstract This document is for the person who installs administers and troubleshoots servers and storage systems Hewlett Packard Enterprise assumes you are qualified in the servicing of compu...

Страница 2: ...ata for Commercial Items are licensed to the U S Government under vendor s standard commercial license Links to third party websites take you outside the Hewlett Packard Enterprise website Hewlett Pac...

Страница 3: ...plug drive LED definitions 25 NVMe SSD LED definitions 26 NVMe SSD button actions 27 Drive box identification 28 Drive bay numbering 29 Fan bay numbering 30 Setup 31 Optional service 31 Initial server...

Страница 4: ...d optical drive options 71 Installing the optical drive in the LFF chassis 71 Installing the optical drive or NVMe drives in the SFF chassis 74 Storage controller options 77 Storage controller install...

Страница 5: ...7 Box 2 to type a controller 128 Box 2 to type p controller 128 Box 3 to system board 129 Box 3 to type a controller 129 Box 3 to type p controller 130 8 bay SFF power cable default 130 16 bay 24 bay...

Страница 6: ...Keeping the system current 154 Updating firmware or system ROM 154 Drivers 157 Software and firmware 157 Operating system version support 157 HPE Pointnext Portfolio 158 Proactive notifications 158 Tr...

Страница 7: ...168 Turkey RoHS material content declaration 169 Ukraine RoHS material content declaration 169 Warranty information 169 Websites 170 Support and other resources 171 Accessing Hewlett Packard Enterpri...

Страница 8: ...the product QuickSpecs on the Hewlett Packard Enterprise website http www hpe com info qs The links in this guide might not cover HPE ProLiant DL180 Gen10 Server information For more information conta...

Страница 9: ...bay LFF drive model Item Description 1 LFF drives 2 NVMe drives optional 3 Optical drive optional 4 iLO Service Port 5 USB 3 0 port 12 bay LFF drive model Item Description 1 LFF drives 2 USB 3 0 port...

Страница 10: ...ial number iLO information pull tab 16 bay SFF drive model Item Description 1 Optical drive optional 2 NVMe drives optional 3 SFF drives 4 iLO Service Port 5 USB 3 0 port 6 Serial number iLO informati...

Страница 11: ...age contains links to server setup information spare part numbers QuickSpecs troubleshooting resources and other useful product links Front panel LEDs and buttons Front panel LEDs and buttons in an LF...

Страница 12: ...erify the following conditions The facility power is present The power supply is installed and is working correctly The power cord is attached and is connected to a power source The front I O cable is...

Страница 13: ...ar panel components with optional rear 2 bay SFF SAS SATA drives Item Description 1 PCIe slots 1 3 top to bottom primary riser for processor 1 2 Serial port optional 3 Rear 2 bay SFF SAS SATA drives o...

Страница 14: ...tom primary riser for processor 1 2 FlexibleLOM optional 3 Serial port optional 4 PCIe slots 4 6 secondary riser for processor 2 optional 5 Standard power supply non hot plug 6 Flexible Slot power sup...

Страница 15: ...ports 3 4 Rear panel LEDs Item Description Status 1 NIC link LED Green Network link Off No network link 2 NIC activity LED Solid green Link to network Flashing green Network active Off No network acti...

Страница 16: ...y mode Power supply error PCIe riser board slot definitions The server ships with a primary PCIe riser cage installed and a secondary PCIe riser cage blank A second processor is required to support in...

Страница 17: ...length x8 8 4 1 FlexibleLOM riser cage assembly Install in the primary PCIe riser connector Item Type Form factor Connector link width Negotiable link width 1 PCIe 3 0 Full height full length x8 8 4 1...

Страница 18: ...x8 x16 x8 secondary riser cage assembly Install in the secondary PCIe riser connector Item Type Form factor Connector link width Negotiable link width 1 PCIe 3 0 Full height full length x16 16 8 4 1...

Страница 19: ...onnector link width Negotiable link width 1 PCIe 3 0 Full height full length x8 8 4 1 2 PCIe 3 0 Full height half length x8 8 4 1 3 PCIe 3 0 Half height half length x8 8 4 1 PCIe slot description Comp...

Страница 20: ...r constant development For the latest information see the PCI SIG website 2 Physical connector link width PCIe devices communicate through a logical connection called an interconnect or link At the ph...

Страница 21: ...1 4 TPM connector 5 Serial port connector 6 iLO Service Port connector 7 Primary PCIe riser connector for processor 1 8 System maintenance switch 9 Mini SAS port 1 10 Mini SAS port 3 11 Media Module c...

Страница 22: ...USB 3 0 port 1 If the memory card connected to the microSD slot is not visible in Windows Device Manager in the menu bar click View Show hidden device System maintenance switch descriptions Position D...

Страница 23: ...uring defaults 3 When the system maintenance switch position 6 is set to the On position and Secure Boot is enabled some configurations cannot be restored For more information see Secure Boot on page...

Страница 24: ...fied by a management application Flashing amber blue 1 flash per second The drive has failed or a predictive failure alert has been received for this drive it also has been identified by a management...

Страница 25: ...efinitions Item LED Status Definition 1 Locate Solid blue The drive is being identified by a host application Flashing blue The drive carrier firmware is being updated or requires an update 2 Activity...

Страница 26: ...bus device A device attached to a PCIe bus cannot be removed without allowing the device and bus to complete and cease the signal traffic flow CAUTION Do not remove an NVMe SSD from the drive bay whil...

Страница 27: ...t configured and predicts the drive will fail Solid amber The drive has failed Off The drive is not configured by a RAID controller 4 Do not remove Solid white Do not remove the drive The drive must b...

Страница 28: ...est PCIe ejection Removal request can be denied by the RAID controller one or more of the logical drives could fail Operating system Drive box identification Front boxes SFF Item Description 1 Box 1 2...

Страница 29: ...box Item Description 1 Box 4 Drive bay numbering 8 bay LFF hot plug drive model 12 bay LFF hot plug drive model 8 bay SFF hot plug drive model 16 bay SFF hot plug drive model Component identification...

Страница 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...

Страница 31: ...ardware and software Hewlett Packard Enterprise Education Services Help train your IT staff 1The time commitment for this repair service might vary depending on the geographical region of site For mor...

Страница 32: ...setting up the server Download the latest SPP http www hpe com servers spp download Support validation required Verify that your OS or virtualization software is supported http www hpe com info ossupp...

Страница 33: ...ilo The iLO Management Port is connected to a secure network b Using a browser navigate to the iLO web interface and then log in https iLO hostname or IP address Note the following The iLO hostname is...

Страница 34: ...D d Save the configuration and reboot the server e Create an array I From the boot screen press F9 to run UEFI System Utilities II From the UEFI System Utilities screen select System Configuration Emb...

Страница 35: ...ensures proper airflow Using a rack without blanking panels results in improper cooling that can lead to thermal damage The 9000 and 10000 Series Racks provide proper server cooling from flow through...

Страница 36: ...rticle 250 as well as any local and regional building codes In Canada you must install the equipment in accordance with Canadian Standards Association CSA C22 1 Canadian Electrical Code In all other c...

Страница 37: ...he rack if it is a single rack installation The racks are coupled together in multiple rack installations Only one component is extended at a time A rack may become unstable if more than one component...

Страница 38: ...se conductive field service tools Use a portable field service kit with a folding static dissipating work mat If you do not have any of the suggested equipment for proper grounding have an authorized...

Страница 39: ...extra length and buckle part of the strap must be facing the outside of the rack rail b Loop the end of the hook and loop strap through the buckle When multiple hook and loop straps are used in the sa...

Страница 40: ...nnect power to the equipment unplug the power cord from the power supply Do not route the power cord where it can be walked on or pinched by items placed against it Pay particular attention to the plu...

Страница 41: ...tem software and firmware updates download the Service Pack for ProLiant from the Hewlett Packard Enterprise website Software and firmware must be updated before using the server for the first time un...

Страница 42: ...the latest information on supported operating systems see the Hewlett Packard Enterprise website The server does not ship with OS media All system software and firmware is preloaded on the server 42 S...

Страница 43: ...dby button for more than 4 seconds to force the server to enter standby mode This method forces the server to enter standby mode without properly exiting applications and the OS If an application stop...

Страница 44: ...requirements and guidelines for manual material handling Get help to lift and stabilize the product during installation or removal especially when the product is not fastened to the rails Hewlett Pac...

Страница 45: ...remove the server from the rack see the documentation that ships with the rack rail system 5 Place the server on a sturdy level surface Releasing the cable management arm Procedure 1 Remove the cable...

Страница 46: ...er grounding can cause electrostatic discharge CAUTION Do not operate the server for long periods with the access panel open or removed Operating the server in this manner results in improper airflow...

Страница 47: ...secured with clips Procedure 1 Place the access panel on top of the server with the latch open Allow the panel to extend past the rear of the server approximately 1 25 cm 0 5 in 2 Push down on the la...

Страница 48: ...ower source b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6...

Страница 49: ...n rotate it 180 counterclockwise b Grasp the riser cage at the touch points and lift it out of the chassis Primary riser cage Secondary riser cage Removing an expansion slot blank Prerequisites T 10 T...

Страница 50: ...owing Extend the server from the rack Remove the server from the rack 4 Remove the access panel 5 Remove the riser cage 6 Remove the slot blank a Press the latch on the slot blank retainer b Open the...

Страница 51: ...board Prerequisites T 15 Torx screwdriver Procedure 1 Power down the server 2 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the server 3 Do one...

Страница 52: ...d Primary riser cage Secondary riser cage Removing the air baffle CAUTION For proper cooling do not operate the server without the access panel baffles expansion slot blanks or blanks installed If the...

Страница 53: ...k 6 Remove the access panel 7 If the full length GPU or the 12G SAS expander is installed remove the riser cage 8 Remove the air baffle Installing the air baffle CAUTION For proper cooling do not oper...

Страница 54: ...panel 4 Install the server into the rack 5 Connect all peripheral cables to the server 6 Connect each power cord to the server 7 Connect each power cord to the power source 8 Power up the server on pa...

Страница 55: ...eing installed read the installation instructions for all the hardware options to identify similar steps and streamline the installation process WARNING To reduce the risk of personal injury from hot...

Страница 56: ...while the Do not remove LED is flashing The Do not remove LED flashes to indicate that the device is still in use Removal of the NVMe SSD before the device has completed and ceased signal traffic flow...

Страница 57: ...SFF drives are installed review Fan population guidelines on page 86 to make sure that the server has adequate fans installed Procedure 1 If installed remove the front bezel 2 Remove the drive blank L...

Страница 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...

Страница 59: ...Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise website Installing an NVMe drive Prerequisites If NVMe drives are installed review Fan population guidelines on page 86 to make sur...

Страница 60: ...ttached to the system For more information see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise website Drive cage options The server supports the following drive cag...

Страница 61: ...b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the a...

Страница 62: ...he server 19 Connect each power cord to the power source 20 Power up the server on page 43 21 If removed install the front bezel The installation is complete Installing the rear 2 bay SFF drive cage P...

Страница 63: ...2 bay SFF drive cage remove the left inner rail 6 Remove the access panel 7 Remove the air baffle 8 If installed remove one of the following components a Secondary riser cage blank b Secondary riser c...

Страница 64: ...ect GPU and rear 2 bay SFF power cable 12 Install the drives 13 Install the air baffle 14 Install the access panel 15 Install the server into the rack 16 Connect all peripheral cables to the server 17...

Страница 65: ...installed remove the front bezel 2 Power down the server 3 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the server 4 Disconnect all peripheral...

Страница 66: ...b Remove the screws lift the top cover slightly and then pull out the partition c Install the NVMe drive cage and then install the screw on the top of the chassis 66 Hardware options installation...

Страница 67: ...the power source 18 Power up the server on page 43 19 If removed install the front bezel The installation is complete Installing the 8 to 12 upgrade option in the LFF chassis The 8 LFF chassis can be...

Страница 68: ...ripheral cables from the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the access panel 7 Remove the air baffle 8 Disconnect the iLO service...

Страница 69: ...n the fillers for future use 12 Install the partition a Lift the top cover upward slightly b Insert the partition c Secure the partition with two screws 13 Remove all fans Hardware options installatio...

Страница 70: ...stall the drive backplane 15 Connect the Mini SAS cable 16 Disconnect the existing power cable 17 Connect the power cable 18 Install the drive in box 1 19 Install all fans 70 Hardware options installa...

Страница 71: ...ver on page 43 27 If removed install the front bezel The installation is complete Optical drive cage and optical drive options Installing the optical drive in the LFF chassis Prerequisites Before you...

Страница 72: ...the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the access panel 7 Remove the air baffle 8 Disconnect the iLO service port cable from syst...

Страница 73: ...b Install the optical drive into cage c Install the optical drive cage into the box 1 Hardware options installation 73...

Страница 74: ...17 Connect each power cord to the power source 18 Power up the server on page 43 19 If removed install the front bezel The installation is complete Installing the optical drive or NVMe drives in the S...

Страница 75: ...rver 4 Disconnect all peripheral cables from the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the access panel 7 Remove the air baffle 8 Re...

Страница 76: ...cage do the following a Install the NVMe drives b Remove the primary riser cage c Install the NVMe and FlexibleLOM riser cage d Disconnect the existing drive power cable e Connect the NVMe signal and...

Страница 77: ...ows the PCIe riser board slots compatible with the storage controllers supported by this server Storage controller option Compatible PCIe slot E208i p P408i p Slot 1 and 21 E208e p P408e p Slot 1 2 3...

Страница 78: ...n and the last to be powered back up Taking this precaution ensures that the system does not erroneously mark the drives as failed when the server is powered up Procedure 1 If installed remove the fro...

Страница 79: ...e front bezel 18 Configure the storage controller The installation is complete Configuring an HPE Smart Array Gen10 controller Procedure 1 Power up the server on page 43 2 If you are running the serve...

Страница 80: ...s in case of an unplanned server power loss After the battery is installed it might take up to two hours to charge Controller features requiring backup power are not enabled until the battery is capab...

Страница 81: ...battery cable as shown in below illustration 11 Connect the controller backup power cable 12 Install the air baffle 13 If removed install the secondary riser cage 14 Install the access panel 15 Insta...

Страница 82: ...cable that ships with the M 2 SSD enablement option Prerequisites Before you perform this procedure make sure that you have the following items available M 2 SSD enablement option M 2 SSD DL180 Gen10...

Страница 83: ...access panel 15 Install the server into the rack 16 Connect all peripheral cables to the server 17 Connect each power cord to the server 18 Connect each power cord to the power source 19 Power up the...

Страница 84: ...ardware option kit T 30 Torx screwdriver Procedure 1 Identify the processor heatsink and socket module components 2 Review the processor cautions 3 If installed remove the front bezel 4 Power down the...

Страница 85: ...the order indicated Otherwise boot failure or intermittent shutdowns might occur c Using a T 30 Torx screwdriver tighten the nuts until they stop 11 Install the air baffle 12 Install the access panel...

Страница 86: ...n One processor with NVMe drives or rear 2 SFF drives installed No Blank Fan Fan Fan Fan Fan One processor with NVMe drives or rear 2 SFF drives installed Yes Fan Fan Fan Fan Fan Fan Two processors No...

Страница 87: ...the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the access panel 7 Remove the air baffle 8 Determine which fan blanks need to be removed...

Страница 88: ...nstallation is complete Memory options IMPORTANT This server does not support mixing LRDIMMs and RDIMMs Attempting to mix any combination of these DIMMs can cause the server to halt during BIOS initia...

Страница 89: ...M x4 4 bit x8 8 bit x16 16 bit 4 Memory generation PC4 DDR4 5 Maximum memory speed 2133 MT s 2400 MT s 2666 MT s 6 CAS latency P CAS 15 15 15 T CAS 17 17 17 U CAS 20 18 18 V CAS 19 19 19 for RDIMM LRD...

Страница 90: ...he front bezel 2 Power down the server 3 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the se...

Страница 91: ...System Utilities System Configuration BIOS Platform Configuration RBSU Memory Options to configure the memory settings Riser board and riser cage options Installing a riser board Prerequisites Before...

Страница 92: ...rack 13 Connect all peripheral cables to the server 14 Connect each power cord to the server 15 Connect each power cord to the power source 16 Power up the server on page 43 The installation is compl...

Страница 93: ...from the server 3 Disconnect all peripheral cables from the server 4 Do one of the following Extend the server from the rack Remove the server from the rack 5 Remove the access panel 6 If installing s...

Страница 94: ...he riser board with the corresponding connectors on the system board and then press down the PCIe riser cage b Push down the release tab rotate it 180 clockwise and then press it flat on the PCIe rise...

Страница 95: ...guidelines for network cards and PCIe workload accelerator options The following table shows the PCIe riser board slots supported with the network cards and the PCIe workload accelerator options of t...

Страница 96: ...b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the a...

Страница 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...

Страница 98: ...h power cord to the power source 21 Power up the server on page 43 The installation is complete Installing the HPE 12G SAS Expander Card option The HPE 12G SAS expander card is supported in the PCIe3...

Страница 99: ...2 Connect the Mini SAS cables between the SAS expander and the controller according to the labels on cables 13 Install the cable clip on the air baffle 14 Install the air baffle 15 Install the primary...

Страница 100: ...ront bezel 2 Power down the server 3 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the server...

Страница 101: ...Secondary riser cage Rear 2 bay SFF SAS SATA drive cage 9 Install the GPU a Remove the expansion slot blank b Install the GPU into the riser cage Primary riser cage Hardware options installation 101...

Страница 102: ...cable in the primary PCI riser cage For specific information about power requirements of a GPU see the GPU user documentation For a list of specific GPU models supported by this server see the server...

Страница 103: ...20 Connect each power cord to the server 21 Connect each power cord to the power source 22 Power up the server on page 43 The installation is complete Installing the FlexibleLOM adapter Prerequisites...

Страница 104: ...Disconnect all peripheral cables from the server 5 Do one of the following Extend the server from the rack Remove the server from the rack 6 Remove the access panel 7 Remove the primary riser cage 8...

Страница 105: ...ing the Media Module Prerequisites Before you perform this procedure make sure that you have a T 15 Torx screwdriver available Procedure 1 If installed remove the front bezel 2 Power down the server 3...

Страница 106: ...Module to the opening on the rear panel b Press the other end of the Media Module down to connect on the system board c Firmly seat the Media Module in the connector and ensure that it is secured with...

Страница 107: ...2 Install the server into the rack 13 Connect all peripheral cables to the server 14 Connect each power cord to the server 15 Connect each power cord to the power source 16 Power up the server on page...

Страница 108: ...r a Disconnect each power cord from the power source b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the server 5 Do one of the following Extend the server from th...

Страница 109: ...installed remove the front bezel 2 Power down the server 3 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the server 4 Disconnect all peripheral...

Страница 110: ...nterprise Power Advisor website http www hpe com info poweradvisor online Installing the redundant power supply assembly CAUTION All power supplies installed in the server must have the same output po...

Страница 111: ...own the server 3 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the server 4 Disconnect all peripheral cables from the server 5 Remove the server...

Страница 112: ...Secondary riser cage Rear 2 bay SFF drive cage 10 Remove the nonredundant power supply 112 Hardware options installation...

Страница 113: ...Install the power supply cage a Align the arrow on the power supply cage with the arrow on the chassis as shown in following illustration b Install the power supply cage Hardware options installation...

Страница 114: ...12 Install the power supply in bay 1 13 If enabling redundant power supply mode do the following a Remove the power supply bay 2 blank 114 Hardware options installation...

Страница 115: ...age 15 Install the air baffle 16 Install the access panel 17 Install the server into the rack 18 Connect all peripheral cables to the server 19 Connect each power cord to the server 20 Connect each po...

Страница 116: ...Remove the air baffle 7 Attach the Chassis Intrusion Detection switch to the chassis connect the cable to the system board and then route the cable as shown in following illustration 8 If removed inst...

Страница 117: ...2 on a supported server In Legacy Boot Mode the configuration can be changed between TPM 1 2 and TPM 2 0 but only TPM 1 2 operation is supported HPE Trusted Platform Module 2 0 Guidelines CAUTION Alwa...

Страница 118: ...0 Kit Installing the Trusted Platform Module board Preparing the server for installation Procedure 1 Observe the following warnings WARNING The front panel Power On Standby button does not shut off sy...

Страница 119: ...including keys will be erased CAUTION The TPM is keyed to install only in the orientation shown Any attempt to install the TPM in a different orientation might result in damage to the TPM or system bo...

Страница 120: ...lt the Trusted Platform Module is enabled as TPM 2 0 when the server is powered on after installing it In UEFI Boot Mode the Trusted Platform Module can be configured to operate as TPM 2 0 or TPM 1 2...

Страница 121: ...TPM 1 2 and TPM 2 0 Changing TPM bus from FIFO to CRB Enabling or disabling TPM Clearing the TPM 8 Enable TPM functionality in the OS such as Microsoft Windows BitLocker or measured boot For more info...

Страница 122: ...printed after BitLocker is enabled When using BitLocker always retain the recovery key password The recovery key password is required to enter Recovery Mode after BitLocker detects a possible comprom...

Страница 123: ...e to verify the length of the cable Use the internal cable management features to properly route and secure the cables When routing cables be sure that the cables are not in a position where they can...

Страница 124: ...rict airflow If you intend to use the removed cables later label and store them for future use Cable routing LFF drive model LFF drive to system board Color Description Orange LFF box 1 to Mini SAS po...

Страница 125: ...port 1 Blue LFF box 3 to the controller port 2 LFF drive to type p controller To support 12 bay LFF the box 1 is connected to the port 1 of second controller Color Description Orange LFF box 2 to the...

Страница 126: ...ge P2 power cable to LFF box 2 Blue P3 power cable to LFF box 3 Yellow P4 power cable to the optical drive 12 bay LFF power cable Color Description Orange P2 power cable to LFF box 1 Blue P3 power cab...

Страница 127: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 127...

Страница 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...

Страница 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...

Страница 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...

Страница 131: ...ption Pink P2 power cable to SFF box 1 or two NVMe drives Blue P3 power cable to SFF box 2 Yellow P4 power cable to SFF box 3 Orange P5 power cable to optical drive Cable routing 12G SAS expander Type...

Страница 132: ...rt 1 Orange Type a controller port 2 to 12G SAS expander port 2 Type p controller to SAS expander Color Description Orange Type p controller port 1 to 12G SAS expander port 1 Blue Type p controller po...

Страница 133: ...1 2 Green and Black 12G SAS expander ports 7 8 to SFF box 3 ports 1 2 Cable routing SFF NVMe and optical drive cage Color Description Orange P2 power cable to two NVMe drives Blue P5 power cable to t...

Страница 134: ...ay SFF drive Mini SAS cable to system board You can connect the rear 2 bay SFF drive to all Mini SAS ports 1 2 or 3 Mini SAS cable to type a controller You can connect the rear 2 bay SFF drive to any...

Страница 135: ...Mini SAS cable to SAS expander Cabling 135...

Страница 136: ...SFF drive backplane to SATA port 5 Blue Rear 2 bay SFF drive backplane to SATA port 4 Yellow Rear 2 bay SFF drive backplane to SATA management port Rear 2 bay SFF power cable Cable routing M 2 SSD M...

Страница 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...

Страница 138: ...outing Smart Storage Battery Cable routing Optical drive SFF Color Description Orange Optical drive signal cable to SATA port 5 Blue Optical drive power cable Yellow Optical drive power cable LFF 138...

Страница 139: ...Color Description Orange Optical drive signal cable to SATA port 5 Blue Optical drive power cable Yellow Optical drive power cable Cable routing Fan Cable routing Front I O SFF Cabling 139...

Страница 140: ...Color Description Orange Front I O cable Blue USB cable Yellow Thermal sensor cable LFF Color Description Orange Front I O cable Blue USB cable Yellow Thermal sensor cable 140 Cabling...

Страница 141: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 141...

Страница 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...

Страница 143: ...Cable routing Chassis Intrusion Detection switch Cable routing Controller backup power cable Primary riser cage Cabling 143...

Страница 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...

Страница 145: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 145...

Страница 146: ...e Product QuickSpecs For more information about product features specifications options configurations and compatibility see the product QuickSpecs on the Hewlett Packard Enterprise website http www h...

Страница 147: ...System Log is full new data overwrites the oldest data in the log It takes less than 5 minutes to download the Active Health System Log and send it to a support professional to help you resolve an iss...

Страница 148: ...es but a license is required for using the following features Group Virtual Media Group power control Group power capping Group configuration and Group firmware update For more information about iLO F...

Страница 149: ...advanced functionality The iLO Amplifier Pack performs rapid server discovery and inventory for thousands of supported servers for the purpose of updating firmware and drivers at scale For more inform...

Страница 150: ...s Also downloading and updating the latest version of Intelligent Provisioning ensures the latest supported features are available For ProLiant servers firmware is updated using the Intelligent Provis...

Страница 151: ...er configuration process This automated server configuration process cuts time from each deployment making it possible to scale rapid high volume server deployments For more information or to download...

Страница 152: ...ot ensures that each component launched during the boot process is digitally signed and that the signature is validated against a set of trusted certificates embedded in the UEFI BIOS Secure Boot vali...

Страница 153: ...party UEFI tools are not restricted 3 If an administrator password is set enter it at the prompt and press Enter The Shell prompt appears 4 Enter the commands required to complete your task 5 Enter th...

Страница 154: ...r additional security external USB functionality can be disabled through USB options in UEFI System Utilities Redundant ROM support The server enables you to upgrade or configure the ROM safely with r...

Страница 155: ...options SUM identifies associated nodes you can update at the same time to avoid interdependency issues Key features of SUM include Discovery engine that finds installed versions of hardware firmware...

Страница 156: ...mware components in the system including the system BIOS NICs and storage cards Procedure 1 Access the System ROM Flash Binary component for your server from the Hewlett Packard Enterprise Support Cen...

Страница 157: ...firmware update Drivers IMPORTANT Always perform a backup before installing or updating device drivers Update drivers using any of the following Smart Update Solutions Download the latest Service Pac...

Страница 158: ...hpe com us en services operational html Utilize the Advisory and Transformation Services in the following areas Private or hybrid cloud computing Big data and mobility requirements Improving data cent...

Страница 159: ...he iLO Virtual NMI feature Troubleshooting resources Troubleshooting resources are available for HPE Gen10 server products in the following documents Troubleshooting Guide for HPE ProLiant Gen10 serve...

Страница 160: ...r water If the server no longer automatically displays the correct date and time then replace the battery that provides power to the real time clock Under normal use battery life is 5 to 10 years Remo...

Страница 161: ...verse the removal procedure 10 Properly dispose of the old battery For more information about battery replacement or proper disposal contact an authorized reseller or an authorized service provider Sy...

Страница 162: ...ture range is extended 5 C to 10 C 41 F to 50 F and 35 C to 40 C 95 F to 104 F at sea level with an altitude derating of 1 0 C per every 175 m 1 8 F per every 574 ft above 900 m 2953 ft to a maximum o...

Страница 163: ...hot plug Power Supply Specification Value Input requirements Rated input voltage 100 VAC to 240 VAC 240 VDC for China only Rated input frequency 50 Hz to 60 Hz Rated input current 5 8 A at 100 VAC 2...

Страница 164: ...t 100 VAC to 127 VAC input 500 W at 100 VAC to 240 VAC input 500 W at 240 VDC input for China only Maximum peak power 500 W at 100 VAC to 127 VAC input 500 W at 100 VAC to 240 VAC input 500 W at 240 V...

Страница 165: ...100 VAC to 240 VAC input 800 W at 240 VDC input for China only HPE 800W Flex Slot Titanium Hot plug Low Halogen Power Supply Specification Value Input requirements Rated input voltage 200 VAC to 240 V...

Страница 166: ...to 60 Hz Rated input current 4 4 A at 200 VAC 3 1 A at 277 VAC 2 3 A at 380 VDC Maximum rated input power 869 W at 200 VAC 865 W at 230 VAC 861 W at 277 VAC 863 W at 380 VDC BTUs per hour 2964 at 200...

Страница 167: ...AC Maximum rated input power 1734 W at 200 VAC 1725 W at 240 VAC BTUs per hour 5918 at 200 VAC 5884 at 240 VAC Power supply output Rated steady state power 1600 W at 200 VAC to 240 VAC input 1600 W at...

Страница 168: ...tion report for this product can be found at www hpe com info reach For Hewlett Packard Enterprise product environmental and safety information and compliance data including RoHS and REACH see www hpe...

Страница 169: ...material content declaration Warranty information To view the warranty information for your product see the links provided below HPE ProLiant and IA 32 Servers and Options www hpe com support ProLiant...

Страница 170: ...owledge SPOCK Storage compatibility matrix www hpe com storage spock Storage white papers and analyst reports www hpe com storage whitepapers For additional general support websites see Support and ot...

Страница 171: ...ponents Accessing updates Some software products provide a mechanism for accessing software updates through the product interface Review your product documentation to identify the recommended software...

Страница 172: ...ise strongly recommends that you register your device for remote support If your product includes additional remote support details use search to locate that information Remote support and Proactive C...

Отзывы: