Operations 20
To install the component:
1.
Prepare the server for installation.
2.
Install the server. When seated properly, the server will be flush with the front of the chassis and the
release lever will close completely without resistance.
3.
Press the Power On/Standby button.
The server powers down and enters standby mode. The system power LED changes from green to
amber. Power is still applied to the server.