
Hardware options installation 69
4.
Place the server on its side.
5.
Remove the access panel (on page
25
).
6.
If installed, remove the PCI air baffle (on page
27
).
7.
Remove the system air baffle (on page
28
).
8.
Remove any installed full-length PCI expansion cards ("
Remove the full-length expansion board
" on
page
29
).
9.
Remove the fan modules and the fan blank (on page
30
).
10.
Disconnect the drive cage cables:
a.
Disconnect the Mini-SAS cable from the system board or from the storage controller option.
b.
Disconnect the drive power cable from the drive power connector.
11.
Remove the four-bay LFF non-hot-plug drive cage assembly.
12.
Install the LFF hot-plug drive cage assembly.
o
Box 1
Содержание ProLiant ML350e Gen8
Страница 16: ...Component identification 16 LFF drive numbering Four bay four bay LFF drive numbering hot plug only ...
Страница 90: ...Cabling 90 RPS configuration Integrated configuration showing Smart Array controller card installed ...
Страница 91: ...Cabling 91 RPS configuration showing Smart Array controller card installed ...
Страница 119: ...Support and other resources 119 ...
Страница 120: ...Support and other resources 120 ...