
Hardware options installation 61
o
For a redundant power supply
10.
Install the PCI air baffle ("
PCI air baffle option
" on page
38
).
11.
Install the access panel (on page
26
).
12.
Return the server to an upright position.
13.
Lock the front bezel (on page
24
).
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server (on page
23
).
Installing the FBWC module and capacitor pack (B120i)
To install the component:
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the front bezel (on page
24
).
4.
Place the server on its side.
5.
Remove the access panel (on page
25
).
6.
If installed, remove the PCI air baffle (on page
27
).
7.
Remove any full-length PCI expansion cards installed in PCI slots 3, 4, 5 and 6 ("
Remove the full-length
expansion board
" on page
29
).
Содержание ProLiant ML350e Gen8
Страница 16: ...Component identification 16 LFF drive numbering Four bay four bay LFF drive numbering hot plug only ...
Страница 90: ...Cabling 90 RPS configuration Integrated configuration showing Smart Array controller card installed ...
Страница 91: ...Cabling 91 RPS configuration showing Smart Array controller card installed ...
Страница 119: ...Support and other resources 119 ...
Страница 120: ...Support and other resources 120 ...