
Operations 26
CAUTION:
For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed.
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the front bezel (on page
24
).
4.
Place the server on its side.
5.
Remove the access panel:
a.
Loosen the access panel thumbscrews.
b.
Slide the access panel back.
c.
Lift the access panel away from the chassis.
Install the access panel
1.
Install the access panel:
a.
Place the access panel on the chassis, and slide it toward the front of the server.
Содержание ProLiant ML350e Gen8
Страница 16: ...Component identification 16 LFF drive numbering Four bay four bay LFF drive numbering hot plug only ...
Страница 90: ...Cabling 90 RPS configuration Integrated configuration showing Smart Array controller card installed ...
Страница 91: ...Cabling 91 RPS configuration showing Smart Array controller card installed ...
Страница 119: ...Support and other resources 119 ...
Страница 120: ...Support and other resources 120 ...