
Hardware options installation 53
4.
Prepare the drive.
5.
Install the drive.
6.
Determine the status of the drive from the drive LED definitions ("
Hot-plug drive LED definitions
" on page
20
).
7.
Install the front bezel (on page
25
).
Installing a non-hot-plug drive
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
To install the component:
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Remove the front bezel (on page
24
).
4.
Place the server on its side.
5.
Remove the access panel (on page
25
).
Содержание ProLiant ML350e Gen8
Страница 16: ...Component identification 16 LFF drive numbering Four bay four bay LFF drive numbering hot plug only ...
Страница 90: ...Cabling 90 RPS configuration Integrated configuration showing Smart Array controller card installed ...
Страница 91: ...Cabling 91 RPS configuration showing Smart Array controller card installed ...
Страница 119: ...Support and other resources 119 ...
Страница 120: ...Support and other resources 120 ...