7.
Connect the cable to the cache module.
8.
Install the battery pack.
9.
Connect the cable to the controller.
10.
Route the cable.
11.
Install the access panel.
12.
For ML110 G6 servers, slide the server back into the rack.
13.
For ML150 G6 servers, do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
14.
Install the server into the rack.
15.
Power up the server (on page 7).
Hardware options installation 34
Содержание ProLiant ML100 G5
Страница 6: ...Customer Self Repair 97 Acronyms and abbreviations 105 Index 108 ...
Страница 103: ...Technical support 103 ...
Страница 104: ...Technical support 104 ...