Removal and replacement procedures 30
3.
After performing the installation or maintenance procedure, slide the server back into the rack:
a.
Press the server rail-release latches and slide the server fully into rack.
WARNING:
To reduce the risk of personal injury, be careful when pressing the server rail-
release latches and sliding the server into the rack. The sliding rails could pinch your fingers.
b.
Press the server firmly into the rack to secure it in place.
Power down the server
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the
equipment, remove the power cord to remove power from the server. The front panel Power
On/Standby button does not completely shut off system power. Portions of the power supply
and some internal circuitry remain active until AC power is removed.
IMPORTANT:
If installing a hot-plug device, it is not necessary to power down the server.
Содержание ProLiant DL380 G5 DPSS
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 16: ...Customer self repair 16 ...
Страница 48: ...Removal and replacement procedures 48 4 Open the heatsink retaining bracket 5 Remove the heatsink ...
Страница 72: ...Removal and replacement procedures 72 14 Install the power supplies 15 Power up the server ...
Страница 74: ...Cabling 74 Fan board cabling Hard drive backplane power cabling ...
Страница 76: ...Cabling 76 Systems Insight Display cabling ...
Страница 94: ...Component identification 94 Only the 12 fan configuration supports all connectors ...