Removal and replacement procedures 69
4.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
5.
Power up the server.
For more information about battery replacement or proper disposal, contact an authorized reseller or an
authorized service provider.
Front I/O module
To remove the component:
1.
If installed, remove the security bezel ("
Remove the security bezel (optional)
" on page
29
).
2.
Power down the server (on page
30
).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
o
Extend the server from the rack (on page
30
).
o
Remove the server from the rack (on page
33
).
5.
Remove the access panel ("
Access panel
" on page
40
).
6.
Remove the front I/O module.
a.
Disconnect the front I/O module from the system board.
b.
Detach the ambient thermal sensor cable from its clip.
c.
Remove the screws and disconnect the front I/O module connectors from the front panel.
—
Four-bay LFF drive model
Содержание ProLiant DL120 Gen9
Страница 5: ...Contents 5 Documentation feedback 117 Index 118 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 26: ...Illustrated parts catalog 26 ...
Страница 36: ...Removal and replacement procedures 36 o Secondary PCI riser cage o PCI blank ...
Страница 116: ...Acronyms and abbreviations 116 UID unit identification USB universal serial bus ...